Copyright © Daily Dive SA

Daily Maverick
Eskom’s winter outlook aims for zero load-shedding if surprise breakdowns stay below 13 GW. A worst-case scenario of 15 GW could lead to 21 days of Stage 2 cuts. CEO Dan Marokane is optimistic about a load-shedding-free winter if outages are controlled. The utility’s forecast is based on improved fleet performance and revised outage scenarios.
Read More from source